As a professional steel structure design, production and erection company, Nam Long owns a modern factory with a management and quality control system according to international standards. We always ensure commitment to customers about standard product quality and on-time delivery. In this article, we will share steel structure quality control activities at Nam Long factory.
At all steel structure production activities at the factory, our principle is “quality first”. Therefore, we always attach special importance to continuously controlling and improving product quality. Every employee is responsible for potential reasons and reports to management so that production runs continuously and smoothly.
In the production line, the output of this stage is the input finished product of the next stage. Therefore, every step is strictly checked by the quality control (QC) team according to international standards, applying the ISO 9001:2015 quality management system. All inspection activities are conducted by skilled engineers certified by competent departments and branches.
The steel structure production process starts from input materials – processing includes cutting, punching, assembling, straightening, sealing, cleaning and painting – the finished product. Below, we will introduce the quality control steps in each stage.
Steel is the main material in the entire steel structure manufacturing process. Therefore, checking raw materials is an important step that needs to be done in detail. Inspection of raw steel includes many steps:
As mentioned above, after each stage is completed, the QC team will check the quality according to the standards (that the project applies) to ensure the finished product for the next step.
Quality control does not stop at completing the production process of the finished product. At Nam Long Steel Structure, we always ensure that goods arriving at the construction site must maintain the same quality as when they left the factory and be convenient for erection. Therefore, steel structures are stored in a dry environment, away from humid air and termites. Finished products are professionally packaged before being neatly arranged into containers or trucks for transport to the construction site.
After the inspection is complete, proceed with acceptance and storage in appropriate conditions. This ensures the quality of steel structures before installing steel structures in projects.